Oil & Gas |
Trial Excavation Works for Replace Boilers at Berri Gas Plant
Sector |
Oil & Gas |
Project Title |
Trial Excavation Works for Replace Boilers at Berri Gas Plant |
Project Owner |
Saudi Aramco |
Client |
JGC |
Department |
Civil |
Location |
Jubail |
Start Date |
01/05/17 |
End Date |
01/06/17 |
Scope of work |
Scope of works includes
Demolition & Disposal od existing concrete slab / asphalt pavement. Trial excavation works. Backfilling using excavated soil & cleaning. Reinstallation of pavement.
|
|
JGC |
Jubail |
01/05/17 |
01/06/17 |
Oil & Gas |
Piping works for Gas Jubail project
Sector |
Oil & Gas |
Project Title |
Piping works for Gas Jubail project |
Project Owner |
SABIC / Gas Jubail |
Client |
eTEC Arabia |
Department |
PSD |
Location |
Jubail |
Start Date |
01/03/17 |
End Date |
01/04/17 |
Scope of work |
Scope of work includes. Scaffolding installation and removal, FRP Piping installation and jointing and hydrotest.
|
|
eTEC Arabia |
Jubail |
01/03/17 |
01/04/17 |
Petrochemical |
Civil Works for Washing Facility for Clean Room
Sector |
Petrochemical |
Project Title |
Civil Works for Washing Facility for Clean Room |
Project Owner |
Sipchem |
Client |
Sipchem |
Department |
Civil |
Location |
Jubail |
Start Date |
01/03/17 |
End Date |
01/04/17 |
Scope of work |
Civil Works for Washing Facility for Clean Room at the Sipchem plant.
|
|
Sipchem |
Jubail |
01/03/17 |
01/04/17 |
Power |
Transformer Dismantling, Lifting and mobility services at Khulais S/S
Sector |
Power |
Project Title |
Transformer Dismantling, Lifting and mobility services at Khulais S/S |
Project Owner |
SEC |
Client |
Fuji Electric |
Department |
TNC |
Location |
Jeddah |
Start Date |
01/03/17 |
End Date |
01/04/17 |
Scope of work |
Scope of work includes
Inspection of 250 MVA Transformer at Workshop, including dismantling, Loading, Transportation from Khulais S/S to workshop
|
|
Fuji Electric |
Jeddah |
01/03/17 |
01/04/17 |
Mining & Minerals |
Supply & Installation of Additional Electric Overhead Travelling Crane (EOT) in Compressor Building at Ammonia Plant
Sector |
Mining & Minerals |
Project Title |
Supply & Installation of Additional Electric Overhead Travelling Crane (EOT) in Compressor Building at Ammonia Plant |
Project Owner |
MA'ADEN |
Client |
Ma'aden Phosphate |
Department |
PSD |
Location |
Ras Al-Khair |
Start Date |
01/02/17 |
End Date |
01/07/17 |
Scope of work |
Scope of work includes
Supply & Installation of Additional Electric Overhead Travelling Crane (EOT) in Compressor, and installation of isolation switch for new crane, power, grounding cables, cable tray supports, termination Jb, wireless pannel with radio remote control. Civil works includes road cutting and paving road with concrete excluding culvert cutting. Excavation for cable laying except trench routing.
|
|
Ma'aden Phosphate |
Ras Al-Khair |
01/02/17 |
01/07/17 |
Petrochemical |
Civil Foundation for DMS Heater
Sector |
Petrochemical |
Project Title |
Civil Foundation for DMS Heater |
Project Owner |
Sipchem |
Client |
Sipchem |
Department |
Civil |
Location |
Jubail |
Start Date |
01/01/17 |
End Date |
01/04/17 |
Scope of work |
Scope of work includes
Cutting the existing slab,excavation,backfilling and compaction. Construction of 2 foundations(1x1x0.3)m and (1.15x1x0.3)m. Fixing insert plate and anchor bolts as per provided drawing.
|
|
Sipchem |
Jubail |
01/01/17 |
01/04/17 |
Petrochemical |
Replacement of CS Sulphuric Acid Lines of SF3-SF4 (AF-1540071)
Sector |
Petrochemical |
Project Title |
Replacement of CS Sulphuric Acid Lines of SF3-SF4 (AF-1540071) |
Project Owner |
Sabic |
Client |
Safco |
Department |
PSD |
Location |
Jubail |
Start Date |
01/01/17 |
End Date |
01/06/17 |
Scope of work |
Scope of work includes
Procurement of piping items as per the provided isometrics, Fabrication of piping including shop NDT, Erection of piping including site NDT, Demolition of existing piping, Procurement and installation of pipe supports, Scaffolding erection and dismantling, Painting and sand blasting, Testing and commissioning
|
|
Safco |
Jubail |
01/01/17 |
01/06/17 |
Oil & Gas |
Scaffolding required for Flare Pipeline Installation
Sector |
Oil & Gas |
Project Title |
Scaffolding required for Flare Pipeline Installation |
Project Owner |
Saudi Aramco |
Client |
Tecnicas Reunidas |
Department |
SCF |
Location |
Jazan |
Start Date |
01/01/17 |
End Date |
September 2019 |
Scope of work |
Scope of work includes Scaffolding Services Scaffolding Services including supplying, erecting, renting and dismantling.
|
|
Tecnicas Reunidas |
Jazan |
01/01/17 |
September 2019 |