Petrochemical |
Space Heater Cable Replacement for 41-PM
Sector |
Petrochemical |
Project Title |
Space Heater Cable Replacement for 41-PM |
Project Owner |
SABIC |
Client |
SAFCO |
Department |
PSD |
Location |
Jubail |
Start Date |
01/08/17 |
End Date |
30/11/17 |
Scope of work |
Scope of work includes.
Supply and Installation of Conduit. Supply and cable laying. Dismantling cable tray cover for cable laying. Re-Installation of cover after cable laying and Termination.
|
|
SAFCO |
Jubail |
01/08/17 |
30/11/17 |
Oil & Gas |
Retrofit Dehydrator Vessel with DFD at HwGOSP-3
Sector |
Oil & Gas |
Project Title |
Retrofit Dehydrator Vessel with DFD at HwGOSP-3 |
Project Owner |
Saudi Aramco |
Client |
Hawiyah GOSP |
Department |
PSD |
Location |
Hawaiyah |
Start Date |
01/08/17 |
End Date |
01/11/17 |
Scope of work |
Scope of work includes.
Demolition work for electrical cathode. New work for electrical cathode prote. Demolition work for instrumentation scop. New work for instrumentation scop Demolition work for piping scope. New work for piping scope. Demolition work for civil /structure scope. New work for civil /structure. Demolition work for Mechanical scope. New work for Mechanical scope excluding Vessel shell internal blasting & coating.
|
|
Hawiyah GOSP |
Hawaiyah |
01/08/17 |
01/11/17 |
Petrochemical |
Revamping of Floating Roof Tank TK-7507
Sector |
Petrochemical |
Project Title |
Revamping of Floating Roof Tank TK-7507 |
Project Owner |
SABIC |
Client |
UNITED |
Department |
PSD |
Location |
Jubail |
Start Date |
01/08/17 |
End Date |
31/12/17 |
Scope of work |
Scope of work includes.
Demolition of existing/used seal for floating roof and NDE testing of support legs, bottom of floating roof and upper side deck/pontoons of floating roof. Disposal of existing/used seal for floating roof. Repair work for five (5) damaged/broken support legs of floating roof. Refloating the roof by firewater and center of floating roof and reset the support legs (2m high position from tank bottom plate) as maintenance position. Replace/installation of new seal parts. Inspection for new seal test after installation by firewater.
Commissioning activity or involvement during filling of tank with product for the first time.
|
|
UNITED |
Jubail |
01/08/17 |
31/12/17 |
Oil & Gas |
Vessels Corroded anchor bolts repair and foundation
Sector |
Oil & Gas |
Project Title |
Vessels Corroded anchor bolts repair and foundation |
Project Owner |
Saudi Aramco |
Client |
Berri Gas Plant |
Department |
PSD |
Location |
Jubail |
Start Date |
01/08/17 |
End Date |
01/08/18 |
Scope of work |
Scope of work includes:
Repair concrete. Removal and repairing of fireproofing system. Replacing and repairing Anchor bolt, weld a plate over the base plate hole was drilled.
|
|
Berri Gas Plant |
Jubail |
01/08/17 |
01/08/18 |
Petrochemical |
PCR-00120-2017 Heat Tracing Maintenance Services
Sector |
Petrochemical |
Project Title |
PCR-00120-2017 Heat Tracing Maintenance Services |
Project Owner |
SADARA |
Client |
SADARA |
Department |
Electrical & Instrumentation |
Location |
Jubail |
Start Date |
01/08/17 |
End Date |
01/08/19 |
Scope of work |
Scope of work includes Maintenance of Elect Heat Tracing System for a period of THREE Years (long-form-contract).
|
|
SADARA |
Jubail |
01/08/17 |
01/08/19 |
Oil & Gas |
HIGH VOLTAGE CABLE SPLICING FOR G-113 A/B
Sector |
Oil & Gas |
Project Title |
HIGH VOLTAGE CABLE SPLICING FOR G-113 A/B |
Project Owner |
Saudi Aramco |
Client |
Uthmaniyah Gas Plant |
Department |
TNC |
Location |
Uthmaniyah |
Start Date |
01/08/17 |
End Date |
01/08/17 |
Scope of work |
Scope of work includes.
• 2 * Motor starter cable termination
• 2 * Motor cable termination
• 2 * Cable termination for junction box
• 1 * Cable splicing
|
|
Uthmaniyah Gas Plant |
Uthmaniyah |
01/08/17 |
01/08/17 |
Petrochemical |
Civil Job for Gate 2 and Electrical Works for EJN-00319 E-Stop
Sector |
Petrochemical |
Project Title |
Civil Job for Gate 2 and Electrical Works for EJN-00319 E-Stop |
Project Owner |
SADARA |
Client |
SADARA |
Department |
Civil |
Location |
Jubail |
Start Date |
01/08/17 |
End Date |
01/10/17 |
Scope of work |
Scope of work includes.
Supply, Installation & Testing of New Emergency Stop Push Button, Cable, Conduit & other Miscellaneous Materials. Cutting, Excavating and Removing the existing asphalt layer including the macadam layer,
Excavating and removing the base course and Sub-base course from the location till the
bottom of existing rigid pavement, Compacting the excavated level to the required Proctor Test MDD as per ASTM D 1557, Providing, Casting, Placing and Compacting the Ready Mix cast in situ concrete of Grade C30 at location adjacent to existing road block at gate 2,
|
|
SADARA |
Jubail |
01/08/17 |
01/10/17 |
Petrochemical |
Supply of Instrument Technicians during MTBE T/A 2015
Sector |
Petrochemical |
Project Title |
Supply of Instrument Technicians during MTBE T/A 2015 |
Project Owner |
SABIC |
Client |
IBN-ZAHR |
Department |
Human Resorce Services |
Location |
Jubail |
Start Date |
|
End Date |
|
Scope of work |
The project scope includes supply of manpower (instruments technicians) to fulfil the T/A requirement during MTBE T/A 2015.
|
|
IBN-ZAHR |
Jubail |
|
|