Petrochemicals

Installation of Drum Loading Station

Installation of Drum Loading Station

Client : UNITED/SABIC

Prime Contractor : UNITED/SABIC

Disciplines : Installation of Drum Loading Station

Location : Jubail

Completion : 2016

Scope of Work : • This project involves all the discipline Mechanical, E & I, Civil, Scaffolding.
• Fabrication and Erection of Piping and Pipe Supports, Erection of Steel Structure,
• Fiber Optic Cable and Power Cable Laying, along with Civil, Scaffolding works.

UNITED/SABIC

Jubail

2016

Petrochemicals

Valve Installation in PH-5/7 SW System

Valve Installation in PH-5/7 SW System

Client : Sabic

Prime Contractor : Gas

Disciplines : Valve Installation in PH-5/7 SW System

Location : Jubail

Completion : 2016

Scope of Work : The project scope is to replace the existing 3 nos. valves (71-LV-8403 A, 71-PV-8455,
51-HV-8451) by new heavy duty gage control valve. And FRP piping modification as
per GAS provided configuration

Sabic

Jubail

2016

Mining & Minerals

SCAFFOLDING SERVICES

SCAFFOLDING SERVICES

Client : MA'ADEN

Prime Contractor : MA'ADEN ALUMINIUM

Disciplines : SCAFFOLDING SERVICES

Location : Ras Al-Khair

Completion : 2017

Scope of Work : This is a long form contract for bolting solutions for 2 Years,

MA'ADEN

Ras Al-Khair

2017

Petrochemicals

Scaffolding Services- SADARA

Scaffolding Services- SADARA

Client : SADARA

Prime Contractor : SADARA

Disciplines : Scaffolding Services- SADARA

Location : Jubail

Completion : 2016

Scope of Work : This is a blanket contract for Six Months Scaffolding Services in SADARA

SADARA

Jubail

2016

Petrochemicals

Preservation services

Preservation services

Client : SADARA

Prime Contractor : SADARA

Disciplines : Preservation services

Location : Jubail

Completion : 2016

Scope of Work : This project involves to carry out all repairs, services and preventive maintenace schedules.

SADARA

Jubail

2016

Petrochemicals

Replacement of Glycol Dehydrator Condenser 1E-1407A/B

Replacement of Glycol Dehydrator Condenser 1E-1407A/B

Client : SABIC

Prime Contractor : SHARQ

Disciplines : Replacement of Glycol Dehydrator Condenser 1E-1407A/B

Location : Jubail

Completion : 2016

Scope of Work : The project involves Cutting and removal of piping , Skidding and removal of condenser , Installation of new condenser , Transportation of removed condenser.

SABIC

Jubail

2016

Steel

Hadeed - SPLP1, Electrical & Instrumentation Upgradation of CCM3, Dedusting System/ Material Handling System

Hadeed - SPLP1, Electrical & Instrumentation Upgradation of CCM3, Dedusting System/ Material Handling System

Client : SAUDI VOEST - ALPINE

Prime Contractor : Hadeed

Disciplines : Hadeed – SPLP1, Electrical & Instrumentation Upgradation of CCM3, Dedusting System/ Material Handling System

Location : Jubail

Completion : 2016

Scope of Work : Project involves upgradation Continious Casting Machine, Dedusting Plant & Material Handling System. Disconnection and Reconnection of 3.5MVA oil Transformer, Installation and Connection of Cast Resin Transformer (1.6MVA &
1.25MVA), Upgradation of vibrating Feeder of Silos, Conveyor Belt Electrics & Automation. Removal & Installation of Panels (New Dedusting Electric Building, Material Handling Load Center Room, Kuttner Room, EAF1PLC Room).

SAUDI VOEST - ALPINE

Jubail

2016

Petrochemicals

Thermal Exp. Vessel construction

Thermal Exp. Vessel construction

Client : Sabic

Prime Contractor : SAUDI KAYAN

Disciplines : Thermal Exp. Vessel construction

Location : Jubail

Completion : 2016

Scope of Work : Project scope includes Engineering, procurement, supply, installation, testing and
pre commissioning of new EO Thermal expansion vessel at SAUDI KAYAN Plant. The
brief scope includes Design and detail engineering works for new EO Thermal
expansion vessel installation, Supply of 01 EO Thermal expansion vessel, related
piping and instruments, Civil foundation works for New EO Thermal expansion vessel,
Supply, fabrication, erection and modification of piping, Painting and insulation
works, Cable laying for instruments, Provision of instruments stanchions, transmitter
sun shade and tube fittings, Configure new AO Card in the system, DCS
Configuration & Scaffolding

Sabic

Jubail

2016